SR 9/I-95 at SR 80/Southern Boulevard
Project Development and Environment (PD&E) StudyProject Newsletter
- Newsletter 1 | November 2015
- Newsletter 2 (English) | December 2016
- Newsletter 2 (Spanish) | December 2016
- Newsletter 3 | October 19, 2017
Public Hearing Documents
- Air Quality Technical Memorandum
- Type 2 Categorical Exclusion Determination
- Cultural Resource Assessment Survey Report
- Contamination Screening Evaluation Report
- Contamination Screening Evaluation Report Appendices
- Preliminary Drainage Report
- Interchange Modification Report
- Natural Resources Evaluation Report
- Noise Study Report
- Preliminary Engineering Report
- Evaluation Matrix
- Existing & Future Traffic (No-Build)
- Advantages & Disadvantages of Alternatives
- Alternative 1 NB-WB (Not Recommended)
- Alternative 3 EB-NB (Not Recommended)
- Alternative 4 NB-WB_EB-NB (Recommended)
- Renderings
- Public Hearing Presentation (Video)
- Public Hearing Presentation (PDF)
- Location Design Acceptance Announcement (PDF)
- Comments & Coordination Report FINAL (PDF)
- Location and Design Concept Acceptance – Categorical Exclusion Type 2 (PDF)
Alternatives Workshop Documents
- Alternatives Workshop Notice
- Public Alternatives Workshop Presentation
- Typical Sections
- Alternative 1
- Alternative 2
- Alternative 3
- Alternative 4
- Alternative 5
- Existing & No-Build Traffic
- Evaluation Matrix
- Concept Development Alternative (ELIMINATED)
- Alternatives Public Workshop Summary
Kick-off Meeting Documents